top of page
Search

SKD Submits Phase 3 Construction Document for HMS

stankaye

SKD submits phase 3 construction documents and specifications for Howard Middle School for the performing arts. 23 sheets of detailed drawings and master format specifications were submitted to Rhodes and Brito Architecture. Creative stage rigging solutions for a 100 year old facility were challenging and a thoughtfully and forward looking modern stage light infrastructure is lean and mean and highly efficient and technologically savvy for the classic facility.












 
 
 

Recent Posts

See All

Thompson High School

SKD has been contracted by the Alabaster Alabama School District to analyze and propose solutions to their large automated rigging system...

Comments


bottom of page